Billing starts when you sign up. Web chat and your lead inbox work right away. See what's built and what's coming.

Home / Industries / Remodelers

Front desk for remodeling contractors

You're on a job site. The next project is calling.

Remodelers and general contractors spend the day on site, with saws running and subs to manage, and new project calls ring out. New Front Desk takes details by chat on your website and puts every project enquiry in one inbox. Missed-call text-back turns on once your number's texting registration is approved.

Billing starts when you sign up; missed-call text-back turns on once your texting registration is approved by the carriers. This page describes how it is designed to work for remodeling contractors. See what's built today.

Where leads slip away

Three moments a contractor loses the project

On site

Saws running, hands full, and a homeowner planning a kitchen calls the next contractor.

How the text back works →

Evenings and weekends

Homeowners plan projects after work and send requests when you're off the clock.

How web chat takes the details →

Bids pile up

Kitchens, baths, additions and small jobs arrive by call, form and chat, and some never get a reply.

How the lead inbox keeps them in order →

Why remodeling calls are different

Older homes, lead and asbestos

The year a home was built changes the job. These points come from the EPA. The lead inbox keeps the year each caller gave.

Lead-safe work needs a certified firm

The EPA's Renovation, Repair and Painting rule requires firms that disturb lead-based paint in homes built before 1978 to be EPA-certified. EPA, RRP rule. A kitchen or bath tear-out in an older home is that kind of work.

Leave sound asbestos alone

The EPA says material in good condition that will not be disturbed, by remodeling for example, should be left alone. EPA, asbestos. A remodel is when it gets disturbed.

Old flooring needs care

The EPA says not to sand or try to level asbestos flooring or its backing, and never to use a power stripper on flooring that may contain asbestos. EPA.

As read for this page, November 2026.

On the phone

What Remodelers callers ask first

Have the answers ready before you call back. Text-back wording by trade can set up the call.

  • How much would a kitchen or bathroom remodel cost?
  • How long will the project take?
  • Do you handle permits?
  • Are you licensed and insured?
  • Can you start this season?

Cost of a missed call

What a missed call costs remodeling contractors

Your own numbers go in the missed calls calculator.

The U.S. Bureau of Labor Statistics puts the median pay for construction laborers and helpers at $22.44 an hour (May 2025). If returning missed calls takes half an hour of a working day, that is $11.22 a day, or $56.10 over a five-day week, in paid time alone (0.5 hours × $22.44 × 5 days). The arithmetic is ours; the hourly figure is theirs.

What you get

Text back, chat, one inbox

On Pro and Premium: follow-ups. See the plans.

Details the chat collects

  • Name and callback number
  • Kitchen, bath, addition, basement or a repair
  • About when the home was built
  • Rough budget and timing
  • How they found you

What it won't do

  • It won't quote a price or promise a start date.
  • It won't say whether a home has lead paint or asbestos.
Missed call · 10:05 AM

A homeowner calls. You're on a job site.

Text back · automatic · every plan

"Cornerstone Remodeling here. Sorry we missed your call, we're on site. Tell us about your project and roughly when you'd like to start, and we'll call you back. Reply STOP to opt out."

Customer · 10:09 AM

"Kitchen remodel, house built 1972. Hoping to start in spring."

Your lead inbox

The reply lands in your inbox with the caller's number, and you get an email alert. You call back on your lunch break.

SAMPLE · conversation written by us, not a real customer

"Cornerstone Remodeling" is a made-up business.

Next step

Stop losing projects while you're on site

Tell us how your company handles calls and messages today, or pick a plan and start. Billing starts when you sign up; what works today is listed on How it works.

Questions

Remodelers questions

Can it give a rough price?

No. It only collects details. You price the job after you see it.

Why ask when the home was built?

Older homes can have lead paint or asbestos materials, and EPA rules apply to disturbing them. Knowing the year early helps you plan the visit and the bid.

Didn't find your answer? Write to newfrontdesks@gmail.com, or see how it works.

Ready when you are.

Sign up now. Web chat and your lead inbox work right away.

Request setup1-minute quizBook a callTextCall now